Review time typically takes 1-5 business days.Ī Permit is also required for the following (click on the link for an application): SUBMITTAL INSTRUCTIONS: Submit the following to the Ohio Township municipal building for review: (1) Zoning Permit Application, (2) permit fee, and (3) a property survey showing the location of the proposed structure. This includes, but is not limited to:ĬLICK HERE FOR A ZONING PERMIT APPLICATION WHEN IS A ZONING PERMIT REQUIRED? A Zoning Permit is required for any detached structure under 1,000 square feet (OR any structure not regulated by a building permit). Trash, Recycling and Yard Waste CollectionĬlick here for a BUILDING PERMIT PROCEDURES GUIDE which details the building permit process from start to finish.Stormwater Management and MS4 Information.Commercial Vehicle Enforcement Task Force.Boards and Committees - Regular Meeting Schedule.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |